HRS §174C-85
Well completion report requirements
After a well is finished, the driller and pump installer must send a written report to the commission within 30 days. The report must include details about the well's construction, water flow, and water quality.
contractorslandowners
The statute, as written — Well completion report
Within thirty days after the completion of the well, the well driller and pump installation contractor shall file with the commission a written report containing such information prescribed by the commission, including, as appropriate: the depth, thickness, and character of the different strata penetrated and the location of water-bearing strata; the date of completion of the well; the length, size, and weight of the casing and a description of the placement of the casing; the size of the drilled hole; where the well is sealed off; the type of seal; the number of cubic feet per second or gallons per minute of flow from the well; the pressure in pounds per square inch, if a flowing well, and the static water level and water temperature, if a nonflowing well; and a chemical analysis of a water sample drawn from the well.
LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.