HCC §23-72
Filing the final subdivision map
Read the official text at hawaiicounty.gov ↗After a preliminary map is approved, the subdivider has one year to survey the land and make a final map that matches the approved plan. The final map must be submitted to the director with a general layout map. The director can extend the deadline for good reason, and the filing date is when the director receives everything.
developerslandowners
The ordinance, as written (Hawaiʻi County) — Filing of final plat
A copy, taken August 21, 2026. The version published by Hawaiʻi County is the one that governs, and it may have changed since. Check it before relying on anything here.
(a) Within one year after tentative approval of the preliminary plat by the director, the subdivider shall have the subdivision surveyed and shall prepare a final plat which conforms with the preliminary plat as tentatively approved. The subdivider shall submit to the director a copy of the final plat, prepared in conformity with these regulations, together with a copy of a general layout map, which was originally attached to the construction drawings and specifications (where required) showing the location of lots, streets, water mains and storm drainage systems. (b) For good cause, the director may grant to the subdivider an extension of time within which the subdivider may file the final plat. 23-25 SUPP. 11 (1-2022) (c) The time of filing the final plat means the time at which the final plat, together with all required data, is received by the director. The director shall indicate the date of filing on all copies of the final plat and accompanying data.
Published by the County of Hawaiʻi Office of the County Clerk.