HCC §5-3-2
Permits needed for work on factory-built homes
Read the official text at hawaiicounty.gov ↗This section says you must get a permit before doing most work on a factory-built home in the county, including building, repairing, or changing it, and any electrical, plumbing, or gas work. To get the permit, you must follow the rules listed in other sections. It also defines what 'manufacture' means.
contractorsdevelopershomeowners
The ordinance, as written (Hawaiʻi County) — Factory-built housing
A copy, taken August 21, 2026. The version published by Hawaiʻi County is the one that governs, and it may have changed since. Check it before relying on anything here.
(a) No person shall perform any of the following work or cause or permit the same to be done on any factory-built housing in the County, without first obtaining a permit for this work from the authority having jurisdiction: (1) Manufacture, install, erect, construct, enlarge, alter, repair, relocate, improve, remove, convert, or demolish any factory-built housing; (2) Manufacture, erect, install, enlarge, alter, repair, remove, convert, or replace any electrical work; or (3) Manufacture, erect, install, enlarge, alter, repair, remove, convert, or replace any plumbing, fire sprinkler, gas, or drainage piping work, or any fixture, gas appliance, water heating, or water treating equipment. (b) To obtain a permit, an applicant shall comply with sections: 5-4-1; 5-4-2, 5-4-3, 5-4- 4, 5-4-5, 5-4-6, 5-4-7, and 5-4-8. (c) For the purposes of this section, “manufacture” means the process of making, fabricating, constructing, forming, or assembling a FBH at a place other than the building site. (2020, ord 20-61, sec 2.) 5-3-2
Published by the County of Hawaiʻi Office of the County Clerk.