KCC §13-4.2

Amendments to the National Electrical Code

Read the official text at ecode360.com ↗

This section changes the county's electrical code for electric vehicle (EV) charging equipment. It sets marking and labeling rules for equipment and panels, and requires construction documents to show future EV charging plans and verify enough electrical capacity. It is a technical amendment to the adopted code.

businessescontractorshomeowners

The ordinance, as written (Kauaʻi County) — Amendments to the National Electrical Code

A copy, taken August 22, 2026. The version published by Kauaʻi County is the one that governs, and it may have changed since. Check it before relying on anything here.

The National Electrical Code, 2017 Edition, is amended as follows:Article 625 (Electric Vehicle Charging System), Part I (General), is amended by amending Section 625.15 (Markings) to read as follows:"625.15 Markings. The equipment shall comply with 625.15(A) through (D).General. All equipment shall be marked by the manufacturer as follows:FOR USE WITH ELECTRIC VEHICLESVentilation Not Required. Where marking is required by 625.52(A), the equipment shall be clearly marked by the manufacturer as follows:VENTILATION NOT REQUIREDThe marking shall be located so as to be clearly visible after installation.Ventilation Required. Where marking is required by 625.52(B), the equipment shall be clearly marked by the manufacturer, "Ventilation Required." The marking shall be located so as to be clearly visible after installation.Service Panel Labeling. The service panel or subpanel circuit directory shall identify the spaces reserved to support EV charging as "EV-Ready." The raceway location shall be permanently and visibly marked as "EV-Capable.""Article 625 (Electric Vehicle Charging System), Part III (Installation) is amended by adding a new Section 625.53 to read as follows:"625.53 Identification. Construction documents shall indicate the raceway termination point and proposed location of future EV spaces and EV chargers. Construction documents shall also provide information about the amperage of future EVCS, raceway methods, wiring schematics, and electrical load calculations to verify that the electrical panel service capacity and electrical system, including any on-site distribution transformers, have sufficient capacity to simultaneously charge all EVs at all required EV spaces at the full rated amperage of the EVCS."
Read the official text at ecode360.com ↗as published Jan 1, 2026our copy taken Aug 22, 2026

The County of Kauaʻi publishes this code through eCode360 and states that it is provided for information only and should not be considered the official version of the Code.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.