KCC §22-16.7

County Engineer Review and Approval

Read the official text at ecode360.com ↗

The County Engineer checks all drainage plans against the stormwater manual and county rules. Even if the County Engineer approves a plan, the owner, engineer, and designer are still responsible for making sure everything is correct and meets the rules. The County Engineer also explains the manual when needed.

businessescontractorsdevelopershomeownerslandlords

The ordinance, as written (Kauaʻi County) — Review, Approval and Interpretation

A copy, taken August 22, 2026. The version published by Kauaʻi County is the one that governs, and it may have changed since. Check it before relying on anything here.

The County Engineer shall review all drainage submittals for compliance with the Stormwater Runoff System Manual and this Article. An approval by the County Engineer shall not relieve any owner, engineer, or designer of the responsibility for ensuring that the calculations, plans, specifications, construction, and as-built drawings, are in compliance with the Stormwater Runoff System Manual and this Article and that the necessary or desired drainage objectives shall be accomplished.The County Engineer shall interpret the Stormwater Runoff System Manual as needed.
Read the official text at ecode360.com ↗as published Jan 1, 2026our copy taken Aug 22, 2026

The County of Kauaʻi publishes this code through eCode360 and states that it is provided for information only and should not be considered the official version of the Code.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.