KCC §25-3.5
Sealing sewer lines when removing buildings
Read the official text at ecode360.com ↗You must get the County Engineer's approval before removing or demolishing any building that has plumbing connected to the public sewer. After removal, you must seal all sewer openings to keep dirt, debris, and water out of the sewer system.
contractorsdeveloperslandowners
The ordinance, as written (Kauaʻi County) — Sealing Disconnected Sewer
A copy, taken August 22, 2026. The version published by Kauaʻi County is the one that governs, and it may have changed since. Check it before relying on anything here.
No person shall remove or demolish any building or structure with plumbing fixtures connected directly or indirectly with the public sewer without first obtaining the approval of the County Engineer. All openings in the sewer line caused by the removal of any building or structures shall be sealed in such a manner as to prevent earth, debris, rain, surface, storm, or other water from entering the public sewer system.
The County of Kauaʻi publishes this code through eCode360 and states that it is provided for information only and should not be considered the official version of the Code.
LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.