MCC §14.05.060

Water service lines for each lot in a subdivision

Read the official text at library.municode.com ↗

When a new subdivision needs a water main, the developer must put in a water service line from the main to each lot, following the county's Water System Standards. If the lots are next to an existing water main, the developer must install the service lines under county supervision or as agreed.

developers

The ordinance, as written (Maui County) — Laterals

A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.

A. Where water main construction is necessary, the subdivider shall provide each lot in the subdivision with a service lateral from the water main to the lot boundary as specified in the publication kept on file with the department entitled "Water System Standards" issued by the department, 2002 edition, as may amended from time to time, and incorporated herein by reference. As an alternative, one service lateral meeting the minimum size requirement for two-lot subdivision, as provided in section 14.05.030 , may be installed for each two lots. B. Where the lots to be created front an existing water main, service laterals as required above shall be installed by the subdivider and supervised by the department, or as agreed upon with the department. (Ord. No. 3730, § 1, 2010)
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026

Published by the County of Maui through Municode.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.