MCC §14.23A.070
Wastewater system construction inspections and approvals
Read the official text at library.municode.com ↗During construction, the county can inspect any wastewater system that connects to the public system, and may require a full-time inspector. You cannot cover or backfill the system until the county approves it after inspection and testing. If the work isn't approved, you must fix, remove, or rebuild it as directed.
contractorsdeveloperslandowners
The ordinance, as written (Maui County) — Construction—inspection and approval
A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.
During the construction of all wastewater systems, including private wastewater systems
that directly of indirectly connect to the public wastewater system, the director
shall have access thereto for inspection purposes and, if considered advisable by
the director, may require an inspector on-site continuously. At no time shall wastewater
systems be backfilled or covered unless the department has been notified and has given
its approval after proper inspection and testing. If the work is not approved, the
wastewater system shall be repaired, removed or reconstructed, as directed by the
department.
(Ord. 2760 § 6 (part), 1999)
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026
Published by the County of Maui through Municode.
LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.