MCC §14.25A.090

When the county can require bigger wastewater systems

Read the official text at library.municode.com ↗

The county can make a subdivider build a larger or deeper wastewater system than the subdivision needs, if good planning and engineering call for it. If that happens, the county must pay the extra cost after the work is accepted.

developers

The ordinance, as written (Maui County) — Oversize facilities

A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.

A. Whenever the director finds that reasonable planning and engineering practices warrant wastewater systems of greater capacity than required to serve a subdivision, he may require the installation thereof. B. Whenever the director requires a subdivider to install a wastewater system greater than required by the subdivision or placed at a greater depth as necessary to serve the subdivision, the department shall reimburse the subdivider with the cost over and above the cost of the improvements that would have been required, after the acceptance by the department of the completed work. (Ord. 2760 § 8 (part), 1999)
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026

Published by the County of Maui through Municode.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.