MCC §14.42.020
Water system plans and estimates
Read the official text at library.municode.com ↗When a proposed improvement includes building or upgrading a water system or water pipes, the public works director must get preliminary plans and cost estimates from the water department. The director must also give the water department the improvement plans it needs, then include the water department's plans and estimates in the report to the council.
courts
The ordinance, as written (Maui County) — Preliminary report—Plans and estimates required for proposed water system or facilities
A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.
If the proposed improvement includes the construction or improvement of a water system
or the laying or installation of conduits, pipes, hydrants, or any appliance for supplying
or distributing a water supply, the director of public works shall obtain from the
department of water supply preliminary plans and estimates for such proposed water
system, or other facilities; and the director of public works shall furnish the department
of water supply with such preliminary plans of the proposed improvement as will enable
the department of water supply to make its plans and estimates for such proposed water
system or other facilities. The director of public works shall incorporate such preliminary
plans and estimates of the department of water supply in his report to the council.
(Ord. 801 § 1 (part), 1974: prior code § 25-3.1.1)
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026
Published by the County of Maui through Municode.