← Back to search

MCC §18.12.020

Final plat preparation and land court filing rules

Read the official text at library.municode.com ↗

This section says a licensed surveyor must do or supervise all surveying for the final plat, and the plat must meet all recording requirements. If the plat is filed with the land court, it must follow land court rules, use the same scales and sheet sizes as another section, and put dedications on separate sheets.

developerssurveyors

The ordinance, as written (Maui County) — Preparation—Requirements

A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.

A. In preparing the final plat, all surveying work shall be made by or under the supervision of a surveyor, and shall meet all requirements for any subsequent recordation. B. If the final plat, following approval by the director, is to be filed with the land court for recordation, it shall comply with all requirements specified under the rules of the land court for land court subdivisions. The scales and sheet sizes utilized on this drawing shall be the same as required under section 18.12.070 , and dedication or other written material shall be submitted on supplemental sheets. (Ord. 789 § 1 (part), 1974: prior code § 11-1.14(b))
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026

Published by the County of Maui through Municode.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.