MCC §18.20.130
Drainage rules for subdivisions
Read the official text at library.municode.com ↗This section sets rules for how drainage systems in subdivisions must be designed and built. It focuses on protecting natural drainage, avoiding harm to nearby areas, and meeting county standards. It also covers requirements for maintenance roads and easements for drainage channels and underground pipes.
developerslandowners
The ordinance, as written (Maui County) — Drainage
A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.
A.
Drainage systems in all subdivisions shall be planned, designed, and constructed in
accordance with standards of the department or consistent with generally accepted
engineering practices certified by an engineer so as to meet the following:
1.
Protect and preserve existing natural drainage ways to the extent feasible;
2.
Design a drainage system to be compatible with surrounding conditions;
3.
Provide a system by which water within the subdivision will be removed using the natural
drainage area where feasible with a minimum disruption to existing drainage patterns
and without causing unnecessary harm to adjoining areas;
4.
Analyze drainage requirements for each subdivision individually and take every means
to insure the ability to subdivide the land within its zoning;
5.
Assure that waters are drained from the subdivision in such a manner that they will
not cause erosion outside of the subdivision to any greater extent than would occur
in the absence of subdivision and improvements thereto; and
6.
Provide for the crossing of watercourses by culverts rather than spanning where possible.
B.
Where interior drainage systems within an area are improved, a storm drainage system
shall be required in all subdivisions within that area where surface runoff cannot
be adequately conveyed. Where open channels are used, the subdivider shall provide
total right-of-way, including a ten foot wide maintenance road along both banks where
the top channel width exceeds fifty feet, and along one bank where the top width is
fifty feet or less. The director may require that maintenance roads along the channel
shall be topped with six inches of crushed coral or base course and treated with bituminous
material. In lieu of a maintenance road, for normally dry channels, access ramps,
or other suitable alternative measures to facilitate maintenance may be provided.
Underground systems shall have a minimum easement width of fifteen feet.
(Ord. No. 4053, § 44, 2013; Ord. 789 § 1 (part), 1974: prior code § 11-1.10(o))
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026
Published by the County of Maui through Municode.
LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.