MCC §18.28.020
Building permits before final subdivision approval
Read the official text at library.municode.com ↗This rule lets the county issue a building permit before a subdivision's final approval, but only if the lot has street access, water, sewer, and other basics, and the remaining minor improvements will be finished within three months (or longer if the builder shows more time is needed). The subdivision improvements must also be bonded.
contractorsdevelopershomeowners
The ordinance, as written (Maui County) — Subdivisions with minor improvements
A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.
Building permits for the erection of buildings in a subdivision where only minor improvements
are required may be issued prior to final approval of improvements required by section
18.20.270 , where the director is satisfied all of the following conditions are met:
A.
The lot is serviced by a street adequate to provide access thereto;
B.
The lot may be adequately served by the existing water system and existing sewer or
other sanitary system;
C.
Service laterals for water, sewer and electricity as well as sidewalks, curbs and
gutter and other minor improvements as required will be completed within three months
from the issuance of a building permit, or within a longer period where the subdivider
shows by a construction schedule or otherwise that more than three months is required
for the erection of the building; and
D.
The construction of subdivision improvements is bonded pursuant to sections 18.20.180 through 18.20.220 .
(Ord. 789 § 1 (part), 1974: prior code § 11-1.18(b))
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026
Published by the County of Maui through Municode.