MCC §20.08.250
Grading report
Read the official text at library.municode.com ↗This rule says when a grading project involves very deep cuts or fills, or fills over certain wet areas, the permit holder must turn in an engineer's report after the work is done. The report must describe the fill, compaction, and tests, and include a certification that the work matched the approved plans.
contractorspersonal representatives
The ordinance, as written (Maui County) — Grading report
A copy, taken August 21, 2026. The version published by Maui County is the one that governs, and it may have changed since. Check it before relying on anything here.
When grading involves cuts or fills in excess of fifteen feet in height, or involves
fills placed over a swamp, pond, gully or lake, the permittee shall submit an engineer's
report upon the completion of such work. This report shall contain:
A.
A description of materials used in the fill and its moisture content at the time of
compaction, the procedure for deposit and compaction of fill, the preparation of original
ground surface before making the fill, and a plan showing the location of compaction
tests made in the fill together with a tabulation of relative compaction densities
obtained at each location;
B.
The recommended soil bearing pressures for proposed structures;
C.
A certification by an engineer that the work was done in conformity with the approved
plans.
(Ord. 2684 § 21, 1998: Ord. 816 § 1 (part), 1975: prior code § 24-3.1(h))
Read the official text at library.municode.com ↗as published Nov 21, 2025our copy taken Aug 21, 2026