← Back to search

ROH §18-4.6

Special inspections must be listed in construction documents

Read the official text at honolulu.gov ↗

The engineer or architect in charge of the structural design must put the required special inspections into the construction documents. This section only says what must be included in those documents.

contractorsdevelopers

The ordinance, as written (Honolulu County) — Construction inspection

A copy, taken August 22, 2026. The version published by Honolulu is the one that governs, and it may have changed since. Check it before relying on anything here.

The engineer or architect in responsible charge of the structural design work shall include in the construction documents the special inspections required in Chapter 16 .
Read the official text at honolulu.gov ↗as published Jan 1, 2026our copy taken Aug 22, 2026

Published by the City and County of Honolulu through American Legal Publishing.

LawTrove is not legal advice. The summary above is a computer-generated restatement — the authoritative text is the official version linked above.